Americas Food Basket
PASSMonday, November 28, 2016 at 6:58 PM
Violations Cited
14-4-202.11
Food Contact Surfaces Design
Clean to remove deep dark stains on cutting boards in prep areas. Monitor.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Replace all missing or ripped curtains going into walk ins. PIC stated that they are on order and will be installed. Place barrer between hand sink and three bay sink in meat prep room.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Label prep sink in produce prep area so staff is not washing equipment in the sink anymore.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Repair walls corner trim and doors in prep rooms and hallway as discussed that are falling apart rusty or damaged. PIC had most done but will have finished asap. Clean ceiling in walk ins and prep rooms. Visibly soiled. Clean soiled light covers in prep rooms.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones