Au Bon Pain
PASSMonday, February 22, 2010 at 3:30 PM
Violations Cited
31-5-203.11
Number Convenient
1) hand sink being used as a rinse sink restrict uses to hand wash only
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
22-4-601/602.11
Food Contact Surfaces Clean
1) slicer blade with old soils clean to remove
Why This Matters
BIOFILM FORMATION: Visible soil indicates biofilms - communities of bacteria protected by slime layers that resist sanitizers. Biofilms on slicers have caused Listeria outbreaks killing 30% of victims. Meat slicer contamination sickened 300 across 6 states. Grease harbors Listeria which grows at refrigeration temperatures.
Code Requirements
Food contact surfaces must be: Visibly clean with no food debris; Free of grease accumulation; Smooth and cleanable; Cleaned and sanitized after each use; Cleaned every 4 hours if in continuous use; Equipment must be disassembled for cleaning when necessary.
Corrective Actions
Clean and sanitize ALL equipment immediately; Disassemble equipment for thorough cleaning; Establish cleaning schedule with assigned responsibilities; Use cleaning checklist; Train on proper disassembly; Increase cleaning frequency
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
1) wall with soils clean to remove
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones