🚨 Recent Restaurant Closures 🚨

Back Bay Sandwich

PASS W/ CONDITIONS

Tuesday, February 14, 2012 at 3:58 PM

Address
31 SAINT JAMES AV
Back Bay, MA 02116
Category
FT
Violations
4 total
⚠️ 1 critical
Facility History
46 inspections
19 failures

Violations Cited

⚠️ CRITICAL M-2-102.11
✓ Corrected

PIC Knowledge

Provide proper certified food allergen trained employee for establishment.

Why This Matters

This violation directly contributes to foodborne illness risk

Code Requirements

Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.

• MINOR 08-3-305-307.11
✓ Corrected

Food Protection

Properly store all food boxes at least 6" from floor in front service coffee station area.

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 08.3.305
• MINOR 29-5-201/02.11

Installed and Maintained

Properly repair leak at hand sink in rear warewashing and food prep area.

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 29.5.201
• MINOR 37-6-501.11-.12
✓ Corrected

Improper Maintenance of Walls/Ceilings

Provide proper missing ceiling tile in rear food prep and warewashing area.

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
View Facility Profile →
Data sourced directly from Boston Inspectional Services Department