🚨 Recent Restaurant Closures 🚨

Boston Halal Market

FAIL

Saturday, June 27, 2009 at 1:52 PM

Address
114 BLACKSTONE ST
Beacon Hill, MA 02108
Category
RF
Violations
4 total
⚠ 1 major
Facility History
17 inspections
8 failures

Violations Cited

⚠ MAJOR 02-3-201.11F

Safe Food Handeling Instructions

1) no labels for products supply

Why This Matters

This violation supports conditions that may lead to foodborne illness

Code Requirements

Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 02.3.201
• MINOR 15-4-202.16

Non-Food Contact Surfaces

1) fly glue traps haging from ceiling remove supply exterminator

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 15.4.202
• MINOR 37-6-201.11
✓ Corrected

Walls/Ceilings Designed Constructed Installed

resurface / repaint rusted pipe

Why This Matters

Poor facility maintenance can harbor pests and prevent proper cleaning

Code Requirements

Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition

FDA Code: Section 37.6.201
• MINOR 37-6-501.11-.12

Improper Maintenance of Walls/Ceilings

1) wall behind meat cutter with soils clean to remove

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
View Facility Profile →
Data sourced directly from Boston Inspectional Services Department