Brighams & Womens Hospital - Tower Cafe
FAILWednesday, August 24, 2011 at 2:06 PM
Violations Cited
08-3-305-307.11
Food Protection
provide covers to all bulk condiments and ice bins
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
pizza reach in/provide accurate thermometer
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
dishmachine/repair leak to pipe catering handsink/repair clogged drain rear catering handsink/repair faucet not to spray/straight flow
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
kitchen/dishroom/mop closet/replace worn/missing ceiling tiles
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones