Brother's Restaurant
FAILTuesday, January 20, 2009 at 2:48 PM
Violations Cited
22-4-601/602.11
Food Contact Surfaces Clean
CLEAN & SANITIZE the big white cutting board ( in the kitchen ) or replace-board is "marked" & worn ( can flip board)
Why This Matters
BIOFILM FORMATION: Visible soil indicates biofilms - communities of bacteria protected by slime layers that resist sanitizers. Biofilms on slicers have caused Listeria outbreaks killing 30% of victims. Meat slicer contamination sickened 300 across 6 states. Grease harbors Listeria which grows at refrigeration temperatures.
Code Requirements
Food contact surfaces must be: Visibly clean with no food debris; Free of grease accumulation; Smooth and cleanable; Cleaned and sanitized after each use; Cleaned every 4 hours if in continuous use; Equipment must be disassembled for cleaning when necessary.
Corrective Actions
Clean and sanitize ALL equipment immediately; Disassemble equipment for thorough cleaning; Establish cleaning schedule with assigned responsibilities; Use cleaning checklist; Train on proper disassembly; Increase cleaning frequency
08-3-305-307.11
Food Protection
IN THE WALK-IN REFRIDGE-at inspection food not covered or wrapped in the walk-in-KEEP all food covered or wrapped-
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
STORE the wiping clothes in a sanitizing solution when not in use & once the clothes have been used to wipe up food spills--SET UP 2 buckets-1. for clothes used with RAW foods & 1. for clothes used with ready to eat food--MARK the buckets RAW & RTE(ready to eat)-change the solution at least every 4 hours once used---this will help kill " germs " on clothes & help prevent spreading "germs"with contaminated clothes--
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
23-4-602.13
Non-Food Contact Surfaces Clean
CLEAN the white color RICE container of built up grime--& CLEAN the microwave ( inside & outside ) & CLEAN the stainless shelves in the kitchen of built up dust & grime- & CLEAN the front of the stainless cabinet holding the "slush " machines--
Why This Matters
INDIRECT CONTAMINATION: Dirty surfaces attract pests, harbor bacteria, and contaminate via contact or air movement. Dust from dirty shelves contains allergens affecting 32 million Americans. Grease accumulation creates slip hazards causing 25% of restaurant injuries.
Code Requirements
Non-food contact surfaces must be cleaned at frequency to prevent: Soil accumulation; Pest attraction; Contamination of food/food contact surfaces. Includes: Equipment exteriors; Shelving; Walls and ceilings; Light fixtures; Ventilation systems.
Corrective Actions
Deep clean all non-food contact surfaces; Create cleaning schedule with daily, weekly, monthly tasks; Assign cleaning zones to staff; Use degreaser for grease accumulation; Clean from top to bottom; Maintain cleaning log
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
CLEAN the wall behind the stove of food "splatter"-
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones