Burger King
PASSFriday, October 14, 2016 at 3:28 PM
Violations Cited
15-4-202.16
Non-Food Contact Surfaces
Hand sink next to the 3 compartment sink is loose and not securely fastened to the wall. Address and make any necessay repairs. Portion of was bay appears to be leaking. Address and make any necessary repairs.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
No evidence of an equipment thermoemter inside of the single door cooler located under the Taylor Ice cream machine. Provide.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Cold water does not run at the hand sink next to the 3 compartment sink and the water is to hot for staff to be bale to wash hands. Address and make any necessary repairs.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas