CAFE MIRROR
PASSThursday, November 13, 2014 at 4:21 PM
Violations Cited
20-4-703.11
Food Contact Surfaces Clean
The sanitizer reading at the low temperature dishwasher was less than 50 ppm chlorine. Provide proper sanitizer levels to be sure that equipment is properly cleaned and sanitized. (instructions left for manual dishwashing)
Why This Matters
INVISIBLE KILLERS: Bacteria survive on 'clean-looking' surfaces for days. Inadequate sanitization caused Salmonella outbreak affecting 1,500 people via ice cream. Cutting boards can harbor 200 times more fecal bacteria than toilet seats. E. coli survives 1-4 hours on surfaces. Norovirus survives 2 weeks. One contaminated slicer infected 300 people with Listeria.
Code Requirements
SANITIZATION MANDATORY: Chemical sanitizers: Chlorine 50-100 ppm, Quaternary Ammonium 200-400 ppm, Iodine 12.5-25 ppm; Hot water: 171°F for 30 seconds by immersion; Contact time: minimum 7-30 seconds depending on sanitizer; Test concentration EVERY 2 hours; Change solution when visibly soiled; ALL food contact surfaces must be sanitized: After each use with different foods; When switching raw to ready-to-eat; Every 4 hours in continuous use.
Corrective Actions
IMMEDIATE: Set up proper sanitizer at ALL stations; Test and adjust concentration NOW; Re-sanitize ALL food contact surfaces; Obtain test strips immediately; Post sanitizer concentration chart; Train staff on test strip use; Create sanitization log; Change solutions every 2 hours minimum
31-5-204/05.11
Location Accessible
The handsink in the kitchen is competely blocked with equipment. Remove items to provide access to handsink. (sink cleared out)
Why This Matters
FORCED NON-COMPLIANCE: Blocked sinks force employees to skip handwashing. Studies show 89% compliance when sinks accessible vs 35% when blocked. Each skipped handwash potentially contaminates multiple food items. Inaccessible sinks contributed to Hepatitis A outbreak affecting 660 people.
Code Requirements
Handwashing sinks must be: Accessible at ALL times; Used ONLY for handwashing; Located within 25 feet of food prep; Clear of all equipment and supplies; Never used for food prep, dishwashing, or chemical disposal; Minimum one sink per 5 workers during peak times.
Corrective Actions
Clear ALL handwashing sinks immediately; Post 'Handwashing Only' signs; Relocate any blocking equipment; Provide alternative sinks for other uses; Train staff on sink designation; Monitor hourly for compliance
M-2-102.11
PIC Knowledge
There is no certified food manager or allergen trained manager at this location and there are numerous risk factor violations. Provide a full-time certified food manager to supervise food safety of the establishment.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
The residential stove in the kitchen is encrusted with grease. Thoroughly clean to remove grease and replace the equipment with a commercial burner if it can no longer be cleaned. (invoice provided for purchase of new stove) The hood vent sticker is difficult to read. Provide paperwork showing that the hood has been cleaned recently when it is due for it's next cleaning.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones