CARMEN
PASS W/ CONDITIONSWednesday, October 14, 2015 at 2:22 PM
Violations Cited
36-6-201.11
Floors Designed Constructed Installed
Re-surface peeling paint on the basement floor as discussed - remove all visible soils and loose debris
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, non-porous surfaces; Properly sloped to drains; No gaps or cracks; Maintained clean
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Clean walls behind the stove and cooking line from all visible food spills stains and soils
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones