CASA ROMERO
PASSFriday, October 31, 2014 at 3:52 PM
Violations Cited
12-3--301.11
Prevention of Contamination from Hands
observed cooks handling ready to eat foods with bare hands also observed wait staff handling bar lemons /limes with bare hands
Why This Matters
Inadequate handwashing is a leading cause of foodborne illness transmission
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
bar/provide tongs or other serving utensils when handling cut fruit wait station/remove utensils from stagnate water provide proper holder for all ice scoops
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
10-4.302.11
Food Utensil Storage
bulk food bins/provide proper scoop with handle bar ice bin/provide proper seperation of cold plate and in use ice
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
provide proper mechanical cold holding station for all products stored in ice bar dishmachine/provide container to empty drinks before warewashing
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
delime dishmachine
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
dishmachine/repair wash gauge 2 door reach in/provide internal thermometer
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
properly store all wiping cloths in a sanitizing solution
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
dishroom handsink/provide employee must wash hands signage mens restroom/provide employee must wash hands signage bar handsinks/provide liquid pump soap/paper towels and employee must wash hands signage
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
hot line/provide up to date licensed hood cleaning sticker
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones