CHEZ-VOUS SKATING RINK
PASSMonday, December 14, 2015 at 6:05 PM
Violations Cited
M-2-102.11
PIC Knowledge
No certified food protection manager. PIC stated kitchen manager taking test at the time of inspection. Provide one full time or two part time CFPM.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
M-3-603.11
Consumer Advisories
No consumer advisory for allergen awareness. Provide.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
36-6-201.11
Floors Designed Constructed Installed
Large hole in floor in front of three compartment sink loosely covered with a piece of plywood. Missing tiles and floor in disrepair in front of rear reach in freezer units. Repair floor.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, non-porous surfaces; Properly sloped to drains; No gaps or cracks; Maintained clean
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker expired. Provide current hood sticker.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones