Chipotle Mexican Grill
FAILFriday, May 20, 2016 at 2:23 PM
Violations Cited
12-2-401.11-.12
Good Hygienic Practices
Observed food handler sampled food on cooking line. Also handler handled cooked chicken with bare hands.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
35-6-501.111/.115
Insects Rodents Animals
Evidence of flies in basement Provide extermination and fly control plan Fly paper hanging in soda box area
Why This Matters
DISEASE VECTORS: Mice produce 50-75 droppings daily containing Salmonella, Hantavirus. Cockroaches carry 33 types of bacteria, 6 parasitic worms. Flies regurgitate and defecate on food, spreading E. coli, Shigella. One mouse can contaminate 10 times more food than it eats. Pest allergens trigger asthma in 26% of inner-city children.
Code Requirements
Facility must be pest-free: No live or dead pests; No droppings or urine; No gnaw marks or rub marks; No nesting materials; Effective pest control program; Monthly professional service recommended; All openings sealed; Remove harborage conditions.
Corrective Actions
Call pest control service immediately; Discard ALL contaminated food; Clean and sanitize all affected areas; Seal all openings larger than 1/4 inch; Install door sweeps; Eliminate standing water; Remove clutter; Increase cleaning frequency
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Pest proof front door to seal all gaps/openings
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones