Club Cafe
FAILTuesday, June 23, 2009 at 5:35 PM
Violations Cited
16-4-501.11/.15
Dishwashng Facilities
Bar glass washers not Functioning to Code. Utilize main dish machine and have Units looked at.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-302.14
Test Kit Provided
No test strips for 2 Bay Detergent/Sanitizer.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
34-5-501.111/.115
Outside Storage Improperly Maintained
Dumpsters open. Evidence of grease thrown into dumpster. Units Filthy Flies allover back alley.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food storage procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Use of a "Solid Fuel" charcoal at hot line. 0ld Sticker on hood. Comply with new C0B. Fire Dept. Regulations.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones