COMPASS SCHOOL
FAILWednesday, January 16, 2008 at 4:01 PM
Violations Cited
08-3-302.11/3-304.11
Separation Segregation Cross Contamination
Chest type freezer -Chicken stored with ready to eat foods. (Corrected onsite).
Why This Matters
Cross-contamination can spread dangerous pathogens throughout the facility
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
M-2-201.11/.14 .15
Non-Compliance w/Employee Health Policy
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Beverage air -Rusted & chipping paint on interior.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
Mens room -No drying device
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Kitchen -Clean walls Mens Room -Replace missing ceiling tiles. Women's room -Dusty ceiling vents.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones