Crazy Dough's Pizza
FAILWednesday, June 14, 2017 at 6:20 PM
Violations Cited
03-3-501.14
Cooling
Plastic bags and containers of cooked /sliced potatoes 64-68F. PIC states product cooked less than 2 hours previous to inspection. Ensure products are properly cooled to 41F or below. Reviewed process with PIC. Product removed from plastic placed on sheet pan and placed in walkin to cool
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Refrigeration at front service line with water pooling on inside- Make proper repairs Refrigeration cold holding at 40F
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Sink not properly draining at service line- Repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Wall outside of pizza oven and wall behind sandwich unit heavily damaged- Repair Violation noted on previous inspection Hood sticker peeled off at pizza station- Contact hood company to replace Hood sticker at hood in back prep -inspected April 2017
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones