Cristelle's Restaurant
PASS W/ CONDITIONSFriday, October 9, 2009 at 3:32 PM
Violations Cited
15-4-202.16
Non-Food Contact Surfaces
paint or seal to provide clean durable non-porous surface
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
provide barrier to protect from splash from one sink to another
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-302.14
Test Kit Provided
locate test kit and test concentration of sanitizer in dish machine between sevice calls
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
clean interior filters and provide routine cleaning service to hood and duct work ensure the company youbare using is on the list of approved vendors. Check www.cityofboston.gov/fire for ordinance requirements and list of companies approved by Boston Fire Dept.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones