🚨 Recent Restaurant Closures 🚨

D Coal Pot

FAIL

Thursday, July 20, 2017 at 5:57 PM

Address
984 HYDE PARK AV
Hyde Park, MA 02136
Category
FT
Violations
4 total
Facility History
58 inspections
32 failures

Violations Cited

• MINOR 14-4-202.11

Food Contact Surfaces Design

Cutting boards visibly soiled with deep dark scores. Clean to remove.

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 14.4.202
• MINOR 15-4-202.16

Non-Food Contact Surfaces

Provide labels on hand sink and prep sink in basement

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 15.4.202
• MINOR 17-4-204.112/.115

Equipment Thermometers

Replace missing equipment therometers in refrigerators.

Why This Matters

This violation affects overall sanitation and food safety

Code Requirements

Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.

FDA Code: Section 17.4.204
• MINOR 37-6-501.11-.12

Improper Maintenance of Walls/Ceilings

Clean hood filters. Visibly soiled. Hood sticker expired on July 10th. Have hood cleaned.

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
View Facility Profile →
Data sourced directly from Boston Inspectional Services Department