Dunkin Donuts
PASSFriday, February 21, 2014 at 3:18 PM
Violations Cited
30-5-203.14
Cross Connection Back Siphonage Backflow
Hose observed being connected directly to a water supply with no evidence of a backflow preventor. Remove or provide some type of back flow prevention system.
Why This Matters
This violation supports conditions that may lead to foodborne illness
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Gasket around small Beverage-Air cooler damaged. Replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Pipe under the 3 bay sink leaking. Repair. Faucet at the hand sink near the 3 compartment sink appears to be leaking. Repair if necessary. Toilet bowl in mens restroom leaking. Repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood and ventilation sticker not marked properly ie: expiration and cleaning dates. Provide Hood and ventilation stickers that have all the current information on them.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones