Eagle Hill Cafe
FAILMonday, September 30, 2024 at 2:51 PM
Violations Cited
590.005/5-205.11-PF
Using a Handwashing Sink-Operation and Maintenance (Pf)
Handsink at toilet blocked with equipment in front. Remove keep accessible all the time.
Why This Matters
This violation supports conditions that may lead to foodborne illness
Code Requirements
Immediate correction required. Follow health code section 105 CMR 590.005. Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
590.002(C)/2-102.12-C
(A) Certified Food Protection Manager (C)
CFPM certificate posted is expired. Provide a current one.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section 105 CMR 590.002(C). Implement proper food safety procedures. Train all staff. Document corrective actions taken.
590.003/3-305.11-C
Food Storage-Preventing Contamination from the Premises (C)
Several food/beverage items stored inside toilet. Remove.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section 105 CMR 590.003. Implement proper food storage procedures. Train all staff. Document corrective actions taken.
590.004/4-101.16-C
Sponges Use Limitation (C)
Observed sponges in use at three bay sink area. Discontinue.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section 105 CMR 590.004. Implement proper food safety procedures. Train all staff. Document corrective actions taken.
590.004/4-903.11-C
(A) and (C) Equipment Utensils Linens and Single-Service and Single-Use Articles-Storing (C)
Boxes with take-out containers and other equipment stored inside toilet. Remove.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section 105 CMR 590.004. Implement proper equipment procedures. Train all staff. Document corrective actions taken.