Fenway Johnnie's
PASSWednesday, May 16, 2018 at 7:40 PM
Violations Cited
M-3-603.11
Consumer Advisories
Consumer advisory missing raw disclosure - Revise consumer advisory
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
No divider between hand sink and clean glass ware - Bar No divider between hand sink and prep table - Kitchen
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Soap in middle bay of 3 bay sink. Sanitizer in wash bay - provided paper ware washing procedures.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Gap at bottom of doors to the exterior - Front and rear doors Dead flies in light shields in kitchen/ware washing
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones