Fins Sushi & Grill Inc.
PASS W/ CONDITIONSWednesday, December 22, 2010 at 4:48 PM
Violations Cited
M-8-103.12
Conformance w/ Approved Procedures
The HACCP plan requires an annual written verification that the sushi recipe has not been changed. The verification has not been updated since 2009. Update. The ownership should obtain written verification from the seafood wholesalers that the fish have gone through proper parasite destruction.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
Whole shelled oysters were observed in a container beneath raw beef. The beef containers were intact with trays beneath. The oysters must be stored on shelving above the raw beef. The oysters were moved during the inspection.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
A few small holes were observed along the stairs to the basement and to the left of the gas meters in the corner of the basement. The holes should be patched.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones