Five Guys Burgers & Fries
FAILMonday, June 19, 2017 at 5:14 PM
Violations Cited
31-5-203.11
Number Convenient
Provide hand sink for men's room. Currently there is no hand sink in the restroom. The restroom is out of order and male employees are using the other restroom that has been converted into a restroom that can be used by men and women. The restrooms are locked at all times and a key is required to gqain entry.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
50 pound bags of potatoes are store on a rack in the customer service area. Relocate potatoes to ensure no public access tot he product. Potatoes should be stored in a restricted area away from the general public.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Repair damaged wall surface in the men's rooom around the hand sink area. Wall surface is falling apart and in a state of disrepair.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones