Hao Shi Guang
FAILWednesday, August 10, 2022 at 2:35 PM
Violations Cited
590.006/6-201.11-C
Floors Walls and Ceilings-Cleanability (C)
In the basement prep kitchen drain pipes run along the ceiling. Provide covering for the exposed pipes to ensure that the ceiling surface is smooth and durable. Remove 2 chest freezers stored below the exposed pipes and do not conduct any food prep below the pipes. PIC reports construction delays with this project. Continue to not store any food items under the drain pipe and do not conduct any food prep below the exposed drain pipe. PIC estimated work will be completed on 8-20-2022.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, non-porous surfaces; Properly sloped to drains; No gaps or cracks; Maintained clean
590.006/6-201.16-C
Wall and Ceiling Coverings and Coatings (C)
Ceiling to the left of the basement prep room is not finished and the framework is exposed. Provide a sealed prep room ceilikng that is smooth durable mom porus and easy to clean.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition