HOUSE OF SIAM
PASSThursday, January 14, 2010 at 6:12 PM
Violations Cited
02-3-602.11-.12/3-302.12
Food Container Labels
1) bulk food containers without labels supply
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
1) products stored on floor elevate 6" off floor
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
1) top of coffin freezer broken/in disrepair repair or replace
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
1) thermometer broken replace 2) no interior thermometer supply
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
1) hood vents with grease build up clean to remove 2) exhaust vents for hood with grease build up clean to remove 3) wall behind broiller with grease build up clean to remove
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones