Jade Garden Restaurant
PASSFriday, June 14, 2013 at 3:33 PM
Violations Cited
08-3-305-307.11
Food Protection
Deliveries of live seafood and/or vegetables should be transported directly to the walk-in after delivery. Cases of food should not be left on the floor. Plastic bags containing vegetables were observed next to whole shelled eggs. Vegetables should be stored above the eggs.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
Soiled wiping cloths should be stored in sanitizer at each active work station. Sanitizing buckets should be present within each active work and food preparation area.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
Hand towels were missing from one of the kitchen hand sinks. Promptly replace the hand towels when the dispenser is empty.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Clean the wall surface behind the dish machine and around and under the three-basin sink.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones