Johnnies On The Side
PASSThursday, April 21, 2016 at 5:20 PM
Violations Cited
14-4-202.11
Food Contact Surfaces Design
Gasket on inside ice machine door in disrepair. Replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Cookline reach in cooler with excess condensation inside. Repair. Provide detailed report from refrigeration maitenance company. Downstairs reach in cooler without equipment motor. Repair/replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Plastic tubing drain from newly installed water heaters on first floor per Owner Dave draining into overflowing 5 gallon bucket in basement. Repair to drain properly into waste drain. Provide detailed report from licensed plumber detailing repairs made.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood over convection oven in back kitchen area without hood sticker. Provide current hood sticker from BFD licensed hood maintenance company.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones