Just Salad
FAILTuesday, October 14, 2025 at 5:49 PM
Violations Cited
590.006/6-201.17-C
Walls and Ceilings Attachments (C)
Provide enclose ceiling in front line that is smooth cleanable and durable 09/02/25 Provide SOP on cleaning schedule for the front line ceiling .Provide Estimate cost for licensed contactor to instail Proper enclose celing in front service line 10/02/25 Provide Documentation from a licensed contractor on the time frame you need for proper enclosed ceiling installed 10/14/25 on Compliance visit The contractor will be installing the ceiling above the front line the week of 10/27 through 10/30 with the work being completed by 10/31.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition