Kapow
PASSTuesday, November 22, 2016 at 3:54 PM
Violations Cited
12-2-401.11-.12
Good Hygienic Practices
Staff using cell phone on cooking line. Discontinue.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
20-4-703.11
Food Contact Surfaces Clean
Witnessed staff washing equipment in middle bay. PIC needs to review how to wash rinse and sanitizer equipment in three bay sink. Paper copy of process taped to wall above three bay sink.
Why This Matters
INVISIBLE KILLERS: Bacteria survive on 'clean-looking' surfaces for days. Inadequate sanitization caused Salmonella outbreak affecting 1,500 people via ice cream. Cutting boards can harbor 200 times more fecal bacteria than toilet seats. E. coli survives 1-4 hours on surfaces. Norovirus survives 2 weeks. One contaminated slicer infected 300 people with Listeria.
Code Requirements
SANITIZATION MANDATORY: Chemical sanitizers: Chlorine 50-100 ppm, Quaternary Ammonium 200-400 ppm, Iodine 12.5-25 ppm; Hot water: 171°F for 30 seconds by immersion; Contact time: minimum 7-30 seconds depending on sanitizer; Test concentration EVERY 2 hours; Change solution when visibly soiled; ALL food contact surfaces must be sanitized: After each use with different foods; When switching raw to ready-to-eat; Every 4 hours in continuous use.
Corrective Actions
IMMEDIATE: Set up proper sanitizer at ALL stations; Test and adjust concentration NOW; Re-sanitize ALL food contact surfaces; Obtain test strips immediately; Post sanitizer concentration chart; Train staff on test strip use; Create sanitization log; Change solutions every 2 hours minimum
M-2-102.11
PIC Knowledge
At this time Certified staff member not at location. He will need to review with all staff proper cooling of foods holding temperatures and proper way to wash equipment in a three bay sink.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
10-3-304.12
Food Utensil Storage
Discontinue to store knives between prep tables and refrigeration units and between refrigerators. At re-inspection knives still being stored between equipment. Address
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Wash bay of three bay sink filled with soiled equipment. Discontinue and store soiled equipment on a cart or drain board and not in sink so staff can properly wash equipment.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Repair leak in pipe in basement behind store area.PIC stated that it is not his pipe but the water is leaking into his dry storage area. Repair leak or provide paperwork from a plumber.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Repair hole in wall in back prep area by hand sink.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones