La Taqueria Taco Bar & Grill
PASSTuesday, May 23, 2017 at 4:02 PM
Violations Cited
03-3-501.16
Hot Holding
Cooked chicken at 127F and cooked beef at 119F. PIC will reheat to above 165F and hot hold above 140F. PIC will have to monitor.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Maintain all hot TCS foods at 135°F or above; Cannot use hot holding equipment to reheat
15-4-202.16
Non-Food Contact Surfaces
As discussed PIC will provide a divider between hand sink and reach in refrigerator and on other side prep table.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Leaking faucet at three bay sink leaking sanitizer dispencer and leaking pipe in mop sink. PIC stated that plumber will be in later today to repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker expired March 2017 Clean hood filters visibly soiled.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones