Lani's Pizza
PASSWednesday, October 12, 2016 at 7:41 PM
Violations Cited
02-3-602.11-.12/3-302.12
Food Container Labels
Provide labels on all bulk food containers on cooking line.
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Provide a divider between hand sink and reach in on cooking line used for fish.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
Discontinue to use sponge to wash equipment in warewashing sink. Use commercial grade equipment as discribed.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker expired July 2016. PIC stated it is schduled to be cleaned next week. Needs top be done before re-inspection date.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones