Ledge
FAILThursday, March 22, 2012 at 2:34 PM
Violations Cited
02-3-602.11-.12/3-302.12
Food Container Labels
LABEL -all food bins--
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
BASEMENT - provide for restroom door to be "self closing "
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
34-5-501.111/.115
Outside Storage Improperly Maintained
OUTSIDE - remove all items not part of the "day to day " operation =old furniture equiptment & clean area of litter-& keep dumpster lids closed tight at all times -
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food storage procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
KITCHEN -clean walls through-out-& CLEAN pipes along ceiling in basement kitchen-
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones