LUCKY'S
PASS W/ CONDITIONSFriday, June 1, 2018 at 1:39 PM
Violations Cited
M-2-103.11
PIC Performing Duties
Sprinkler discharge above convection oven-kitchen Provide professional cleaning company to clean/sanitize/disinfect all affected areas.Provide all documentation & Be re-inspected by health department before receiving approval to re-open kitchen.8-404-11 Immenent Health Hazard. Provide documentation of sprinkler repair.
Why This Matters
EXTREME RISK: Without active management, ALL five CDC risk factors go unchecked. Studies show restaurants without certified managers have 2.5 times more critical violations. Lack of supervision leads to: temperature abuse (bacteria double every 20 minutes), cross-contamination spreading pathogens, sick employees working with food, improper cooking allowing pathogen survival. This single violation enables conditions for major outbreaks.
Code Requirements
PIC MUST: Be present during ALL operating hours; Hold valid food safety certification; Actively monitor employee health and hygiene; Ensure proper cooking, cooling, and holding temperatures; Verify foods from approved sources; Monitor handwashing compliance; Ensure equipment properly sanitized; Take immediate corrective actions for violations; Demonstrate knowledge to health inspector; Train and supervise all food employees.
Corrective Actions
IMMEDIATE: Designate qualified PIC immediately; If no certified manager available, cease operations; Implement active managerial control system; Create monitoring logs for all CDC risk factors; Retrain management on responsibilities; Post PIC duties checklist
23-4-602.13
Non-Food Contact Surfaces Clean
Clean/sanitize/disinfect all affected areas due to sprinkler break
Why This Matters
INDIRECT CONTAMINATION: Dirty surfaces attract pests, harbor bacteria, and contaminate via contact or air movement. Dust from dirty shelves contains allergens affecting 32 million Americans. Grease accumulation creates slip hazards causing 25% of restaurant injuries.
Code Requirements
Non-food contact surfaces must be cleaned at frequency to prevent: Soil accumulation; Pest attraction; Contamination of food/food contact surfaces. Includes: Equipment exteriors; Shelving; Walls and ceilings; Light fixtures; Ventilation systems.
Corrective Actions
Deep clean all non-food contact surfaces; Create cleaning schedule with daily, weekly, monthly tasks; Assign cleaning zones to staff; Use degreaser for grease accumulation; Clean from top to bottom; Maintain cleaning log
36-6-501.11-.12
Improper Maintenance of Floors
Clean/sanitize/disinfect affected floors/remove all standing water.
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Clean /sanitize/disinfect affected walls & ceiling areas. Provide all cleaning/sanitizing documentation to the Health department.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones