MAGGIANO'S
PASSTuesday, December 29, 2015 at 4:43 PM
Violations Cited
31-5-204/05.11
Location Accessible
Lower Level - Hand wash sink at the warewashing area and near the cooking line used to store soiled equipment. Restrict usage to handwashing only.
Why This Matters
FORCED NON-COMPLIANCE: Blocked sinks force employees to skip handwashing. Studies show 89% compliance when sinks accessible vs 35% when blocked. Each skipped handwash potentially contaminates multiple food items. Inaccessible sinks contributed to Hepatitis A outbreak affecting 660 people.
Code Requirements
Handwashing sinks must be: Accessible at ALL times; Used ONLY for handwashing; Located within 25 feet of food prep; Clear of all equipment and supplies; Never used for food prep, dishwashing, or chemical disposal; Minimum one sink per 5 workers during peak times.
Corrective Actions
Clear ALL handwashing sinks immediately; Post 'Handwashing Only' signs; Relocate any blocking equipment; Provide alternative sinks for other uses; Train staff on sink designation; Monitor hourly for compliance
M-2-103.11
PIC Performing Duties
Retrain staff with regard to hand washing sinks usage.
Why This Matters
EXTREME RISK: Without active management, ALL five CDC risk factors go unchecked. Studies show restaurants without certified managers have 2.5 times more critical violations. Lack of supervision leads to: temperature abuse (bacteria double every 20 minutes), cross-contamination spreading pathogens, sick employees working with food, improper cooking allowing pathogen survival. This single violation enables conditions for major outbreaks.
Code Requirements
PIC MUST: Be present during ALL operating hours; Hold valid food safety certification; Actively monitor employee health and hygiene; Ensure proper cooking, cooling, and holding temperatures; Verify foods from approved sources; Monitor handwashing compliance; Ensure equipment properly sanitized; Take immediate corrective actions for violations; Demonstrate knowledge to health inspector; Train and supervise all food employees.
Corrective Actions
IMMEDIATE: Designate qualified PIC immediately; If no certified manager available, cease operations; Implement active managerial control system; Create monitoring logs for all CDC risk factors; Retrain management on responsibilities; Post PIC duties checklist
22-4-601/602.11
Food Contact Surfaces Clean
Slicer at the prep area soiled with dried up food debris. Clean and sanitize properly.
Why This Matters
BIOFILM FORMATION: Visible soil indicates biofilms - communities of bacteria protected by slime layers that resist sanitizers. Biofilms on slicers have caused Listeria outbreaks killing 30% of victims. Meat slicer contamination sickened 300 across 6 states. Grease harbors Listeria which grows at refrigeration temperatures.
Code Requirements
Food contact surfaces must be: Visibly clean with no food debris; Free of grease accumulation; Smooth and cleanable; Cleaned and sanitized after each use; Cleaned every 4 hours if in continuous use; Equipment must be disassembled for cleaning when necessary.
Corrective Actions
Clean and sanitize ALL equipment immediately; Disassemble equipment for thorough cleaning; Establish cleaning schedule with assigned responsibilities; Use cleaning checklist; Train on proper disassembly; Increase cleaning frequency
02-3-602.11-.12/3-302.12
Food Container Labels
Some bulk food containers missing proper labels. Provide.
Why This Matters
Improper labeling can lead to using wrong or expired ingredients
Code Requirements
Immediate correction required. Follow health code section . Implement proper food labeling procedures. Train all staff. Document corrective actions taken.
14-4-202.11
Food Contact Surfaces Design
Seveal cutting boards at the cooking line and prep area heavily scored. Resurface or replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Upper Level Kitchen-Wash Temp Gauge not working at high temp dish machine and glass washer. Repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
Several wiping cloths stored soiled/wet on the counters. Store properly in sanitizer solution.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
24-4-903.11
Clean Equipment & Utensils Storage
Pastry Area-Several utensils stored inside a plastic container with food contact surfaces up. Store properly inverted.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Main Kitchen-Hand washing sink faucet loose at the hand washing sink near the entrance. Repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Banquet Kitchen- Hood at the cooking line with large amount of grease. Clean properly.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones