New Dong Khanh Restaurant
FAILWednesday, May 11, 2016 at 2:46 PM
Violations Cited
35-6-501.111/.115
Insects Rodents Animals
Rat droppings found in basement area clean to remove 2) added 5-11-16 outside in alley large hole seen as entry point for rodents repair or seal to prevent entry
Why This Matters
DISEASE VECTORS: Mice produce 50-75 droppings daily containing Salmonella, Hantavirus. Cockroaches carry 33 types of bacteria, 6 parasitic worms. Flies regurgitate and defecate on food, spreading E. coli, Shigella. One mouse can contaminate 10 times more food than it eats. Pest allergens trigger asthma in 26% of inner-city children.
Code Requirements
Facility must be pest-free: No live or dead pests; No droppings or urine; No gnaw marks or rub marks; No nesting materials; Effective pest control program; Monthly professional service recommended; All openings sealed; Remove harborage conditions.
Corrective Actions
Call pest control service immediately; Discard ALL contaminated food; Clean and sanitize all affected areas; Seal all openings larger than 1/4 inch; Install door sweeps; Eliminate standing water; Remove clutter; Increase cleaning frequency
33-5-501.13-.17
Adequate Number Frequency Vermin Proof
outside grease barrel and greasee barrel container with heavy grease build up clean to remove
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
grease build up and debris on floor under cooking line clean to remove
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas