NEW HONG KONG RESTAURANT
PASSTuesday, October 30, 2007 at 4:31 PM
Violations Cited
35-6-501.111/.115
Insects Rodents Animals
1) Roaches seen on and under upright freezer clean to Remove and Supply proper IPM report from exterminators. 10/23/07. Terminex coming today @ 3pm to deal with issues and will contact health department of their findings and corrective actions
Why This Matters
DISEASE VECTORS: Mice produce 50-75 droppings daily containing Salmonella, Hantavirus. Cockroaches carry 33 types of bacteria, 6 parasitic worms. Flies regurgitate and defecate on food, spreading E. coli, Shigella. One mouse can contaminate 10 times more food than it eats. Pest allergens trigger asthma in 26% of inner-city children.
Code Requirements
Facility must be pest-free: No live or dead pests; No droppings or urine; No gnaw marks or rub marks; No nesting materials; Effective pest control program; Monthly professional service recommended; All openings sealed; Remove harborage conditions.
Corrective Actions
Call pest control service immediately; Discard ALL contaminated food; Clean and sanitize all affected areas; Seal all openings larger than 1/4 inch; Install door sweeps; Eliminate standing water; Remove clutter; Increase cleaning frequency
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
1) Hood vents with heavy grease build up clean daily to Remove . Provide Hood cleaning paper work. 2) Walls behind and around cooking line with grease. clean to Remove.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones