Panera Bread Bakery/Cafe
PASS W/ CONDITIONSTuesday, May 4, 2010 at 3:29 PM
Violations Cited
31-5-204/05.11
Location Accessible
The hand sink at the far end of the sandwich preparation line was blocked by a trash barrel. The barrel was promptly removed once noted. Staff and management stated that it is normally set within another location.
Why This Matters
FORCED NON-COMPLIANCE: Blocked sinks force employees to skip handwashing. Studies show 89% compliance when sinks accessible vs 35% when blocked. Each skipped handwash potentially contaminates multiple food items. Inaccessible sinks contributed to Hepatitis A outbreak affecting 660 people.
Code Requirements
Handwashing sinks must be: Accessible at ALL times; Used ONLY for handwashing; Located within 25 feet of food prep; Clear of all equipment and supplies; Never used for food prep, dishwashing, or chemical disposal; Minimum one sink per 5 workers during peak times.
Corrective Actions
Clear ALL handwashing sinks immediately; Post 'Handwashing Only' signs; Relocate any blocking equipment; Provide alternative sinks for other uses; Train staff on sink designation; Monitor hourly for compliance
36-6-501.11-.12
Improper Maintenance of Floors
The flooring within the walk-in refrigerator should be mopped. Staff appear to have mopped around the coaster wheels of the portable storage racks. The racks should be moved outside of the walk-in when the floor is mopped.
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas