Panera Bread No. 1415
FAILThursday, March 5, 2015 at 3:51 PM
Violations Cited
12-2-301.12-.15
Adequate Handwashing/Where/When/How
Multiple handsinks with no soap available- Provide and ensure employees are properly washing hands
Why This Matters
Inadequate handwashing is a leading cause of foodborne illness transmission
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
41-7-201/04.11
Separation/Sanitizer Criteria
Sanitizer at 3 bay sink at 500ppm from mounted dispenser- Repair to ensure sanitizer is at 200-400ppm. Dilute sanitizer soultion until repairs area made.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
22-4-601/602.11
Food Contact Surfaces Clean
Bread cutting machine with heavy food buildup and soils- Clean with proper frequency
Why This Matters
BIOFILM FORMATION: Visible soil indicates biofilms - communities of bacteria protected by slime layers that resist sanitizers. Biofilms on slicers have caused Listeria outbreaks killing 30% of victims. Meat slicer contamination sickened 300 across 6 states. Grease harbors Listeria which grows at refrigeration temperatures.
Code Requirements
Food contact surfaces must be: Visibly clean with no food debris; Free of grease accumulation; Smooth and cleanable; Cleaned and sanitized after each use; Cleaned every 4 hours if in continuous use; Equipment must be disassembled for cleaning when necessary.
Corrective Actions
Clean and sanitize ALL equipment immediately; Disassemble equipment for thorough cleaning; Establish cleaning schedule with assigned responsibilities; Use cleaning checklist; Train on proper disassembly; Increase cleaning frequency
15-4-202.16
Non-Food Contact Surfaces
Soap dispenser broken off wall and sitting on edge of sink making it difficult to use- Repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
16-4-501.11/.15
Dishwashng Facilities
Temperature guage on dishwasher not properly functioning- Repair
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
17-4-204.112/.115
Equipment Thermometers
No conspicuous thermometers in multiple refrigeration units- Provide
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
No handsoap available at multiple handwash sinks- Corrected at time of inspection by PIC
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Black mold like buildup on walls behind 3 Bay- Clean
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones