Rice Burg Inc.
PASS W/ CONDITIONSTuesday, April 19, 2016 at 4:08 PM
Violations Cited
27-5-103.11-.12
Hot and Cold Water
No water available on the truck.Provide that all water tank repairs are complete and that water tank is full before leaving the commissary.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper temperature control procedures. Train all staff. Document corrective actions taken.
M-2-103.11
PIC Performing Duties
Provide up to date CFPM and Allergen awareness certificate for PIC on the truck. PIC must monitor all repairs needed.Repairs must be completed for truck to be fully operational. PIC must check all mechanical operations of the truck before leaving the commissary. PIC must monitor that the truck is clean and organized daily.
Why This Matters
EXTREME RISK: Without active management, ALL five CDC risk factors go unchecked. Studies show restaurants without certified managers have 2.5 times more critical violations. Lack of supervision leads to: temperature abuse (bacteria double every 20 minutes), cross-contamination spreading pathogens, sick employees working with food, improper cooking allowing pathogen survival. This single violation enables conditions for major outbreaks.
Code Requirements
PIC MUST: Be present during ALL operating hours; Hold valid food safety certification; Actively monitor employee health and hygiene; Ensure proper cooking, cooling, and holding temperatures; Verify foods from approved sources; Monitor handwashing compliance; Ensure equipment properly sanitized; Take immediate corrective actions for violations; Demonstrate knowledge to health inspector; Train and supervise all food employees.
Corrective Actions
IMMEDIATE: Designate qualified PIC immediately; If no certified manager available, cease operations; Implement active managerial control system; Create monitoring logs for all CDC risk factors; Retrain management on responsibilities; Post PIC duties checklist
08-3-305-307.11
Food Protection
Canned pineapple stored in original can.Provide food grade containers for storage after opening.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
13-2-304/402.11
Clean Cloths Hair Restraint
Staff observed without hair restraints.Provide.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
21-3-304.14
Wiping Cloths Clean Sanitize
No sanitizer set up on the truck.Provide proper sanitizer solution during operating hours.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood sticker expired 3.6.16.Provide proper cleaning from a licensed company. Clean all hood vents to remove soils and grease buildup. Post up to date sticker.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones