Ruggles Pizza and Cafe
PASSWednesday, March 9, 2016 at 5:13 PM
Violations Cited
17-4-204.112/.115
Equipment Thermometers
provide internal thermometer to register 41 degrees or below at front display case
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper equipment procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
ice machine/provide proper air gap at drain handsinks/repair mixing valves
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
handsink/provide refill of paper towels and liquid soap
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
repair hole/provide cover around soda lines at wall kitchen/seal holes around all piping
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones