Samurai Boston
PASSWednesday, July 23, 2008 at 4:03 PM
Violations Cited
12-2-301.12-.15
Adequate Handwashing/Where/When/How
Sushi bar employees are just rinsing their hands. Train employees to properly wash their hands with soap.
Why This Matters
Inadequate handwashing is a leading cause of foodborne illness transmission
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
M-2-102.11
PIC Knowledge
High temperature dishwasher is broken and employees do not know how to setup 3-compartment sink. Train employees to properly wash dishes. Provide a manager who is knowledgeable in food safety.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
M-8-103.12
Conformance w/ Approved Procedures
Lab test needs to be updated. HACCP plan is due for review and employees need to be retrained. pH logs are not current records stop a few weeks ago. Provide daily logs.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
08-3-305-307.11
Food Protection
Bar: Soda tube is turning through customer ice. Provide separation. Sushi bar: the hardsinlcs we adjacent to prep. Provide separation. Items are stored on top of the ice machine.Store items separate.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
14-4-202.11
Food Contact Surfaces Design
Bulk rice is dispensed with a bowl. Provide a food grade scoop with a handle.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
23-4-602.13
Non-Food Contact Surfaces Clean
Cooking equipment is soiled. Clean cooking line to remove debris. Prep sinks are soiled. Clean to remove.
Why This Matters
INDIRECT CONTAMINATION: Dirty surfaces attract pests, harbor bacteria, and contaminate via contact or air movement. Dust from dirty shelves contains allergens affecting 32 million Americans. Grease accumulation creates slip hazards causing 25% of restaurant injuries.
Code Requirements
Non-food contact surfaces must be cleaned at frequency to prevent: Soil accumulation; Pest attraction; Contamination of food/food contact surfaces. Includes: Equipment exteriors; Shelving; Walls and ceilings; Light fixtures; Ventilation systems.
Corrective Actions
Deep clean all non-food contact surfaces; Create cleaning schedule with daily, weekly, monthly tasks; Assign cleaning zones to staff; Use degreaser for grease accumulation; Clean from top to bottom; Maintain cleaning log
29-5-201/02.11
Installed and Maintained
Bathroom water is cold Provide hot water.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Hood vent is soiled with grease and there are no tags to indicate when it was cleaned. Clean vent.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones