SOUPER SALAD
PASSFriday, September 28, 2012 at 3:47 PM
Violations Cited
22-4-601/602.11
Food Contact Surfaces Clean
Properly seal all salad bar counter area's free of cracks and food residue. Potential harborage for insects and rodents.
Why This Matters
BIOFILM FORMATION: Visible soil indicates biofilms - communities of bacteria protected by slime layers that resist sanitizers. Biofilms on slicers have caused Listeria outbreaks killing 30% of victims. Meat slicer contamination sickened 300 across 6 states. Grease harbors Listeria which grows at refrigeration temperatures.
Code Requirements
Food contact surfaces must be: Visibly clean with no food debris; Free of grease accumulation; Smooth and cleanable; Cleaned and sanitized after each use; Cleaned every 4 hours if in continuous use; Equipment must be disassembled for cleaning when necessary.
Corrective Actions
Clean and sanitize ALL equipment immediately; Disassemble equipment for thorough cleaning; Establish cleaning schedule with assigned responsibilities; Use cleaning checklist; Train on proper disassembly; Increase cleaning frequency
33-5-501.116
Improper Cleaning of Receptacles
Properly clean and disinfect all undercounter trash compartment receptacles in establishment.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Properly seal all gaps in salad bar and walls area's at salad bar service area.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones