🚨 Recent Restaurant Closures 🚨

Stand No. 710-Lucky's Chicken

PASS

Friday, November 24, 2017 at 4:44 PM

Address
100 LEGENDS WA
West End, MA 02114
Category
FT
Violations
2 total
Facility History
26 inspections
4 failures

Violations Cited

• MINOR 37-6-501.11-.12
✓ Corrected

Improper Maintenance of Walls/Ceilings

replace missing ceiling tile on kitchen ceiling Remove greasde buildup from hood filters above the fryers

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
• MINOR 37-6-501.11-.12
✓ Corrected

Improper Maintenance of Walls/Ceilings

Why This Matters

OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.

Code Requirements

Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.

Corrective Actions

Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones

Mass. Code: 105 CMR 590.006(B) | FDA Code: Section 6-501.11, 6-501.12
View Facility Profile →
Data sourced directly from Boston Inspectional Services Department