SUBWAY
FAILThursday, May 15, 2008 at 4:08 PM
Violations Cited
41-7-201/04.11
Separation/Sanitizer Criteria
The quats sanitizer is over 400 ppm. Provide proper sanitizer levels.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
19-4-501.18-.110
Wash Rinse Water Clean Proper Temperature.
Sanitizer water is 75 F. Provide warm sanitizer water over 75 F.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper temperature control procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
The prep sink is leaking. Repair. Employee bathrooms: The toilets keep backing up. Repair and provide plumber's report to show the problem is properly corrected.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
Floor in employee bathroom is soiled. Clean to remove
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas