SUBWAY
PASS W/ CONDITIONSFriday, January 22, 2010 at 6:00 PM
Violations Cited
14-4-202.11
Food Contact Surfaces Design
Plastic pitcher is heavily soiled.Replace
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Outside plastic protection cover is broken. on the bottom shelf containing cookies.Replace No seperation from handsink to shelving containing supplies and foods.Provide Top of grease trap is rusted and soiled.Clean or re-surface
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-201.11
Floors Designed Constructed Installed
Floor tiles are starting to crack in front of rear handsink.Repair as needed
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, non-porous surfaces; Properly sloped to drains; No gaps or cracks; Maintained clean
37-6-201.11
Walls/Ceilings Designed Constructed Installed
Rear srceen door is broken.Repair as needed
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Clean covers on vents in ceiling from dust and debris build up
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones