THE BOSTON ICE CREAM FACTORY
FAILTuesday, May 27, 2014 at 5:35 PM
Violations Cited
08-3-305-307.11
Food Protection
Dirty mop and bucket observed being stored in the dry storage room. Discontinue and store appropriately to ensure no contamination from dirty mop and bucket.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
26-4-502.13
Re-use of Single Service Articles
Single use paper cups being used to dispense nuts and sugar. Discontinue and use a hanlded scoop to prevent contamination from hands.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Cold water fuacet at the hadn sink near the front service counter not operating properly. Repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
Several portions of the floor in the back preparation room with missing tiles. Replace. Floor drain near 3 bay sink missing cover. Replace.
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas