The Upper Crust
PASSThursday, October 16, 2008 at 2:54 PM
Violations Cited
41-7-201/04.11
Separation/Sanitizer Criteria
The sanitizer in the three compartment sink is over 400 ppm quats. Provide proper sanitizer levels.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
19-4-501.18-.110
Wash Rinse Water Clean Proper Temperature.
The wash water is below 75F. Provide hot wash water at 75F or above.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper temperature control procedures. Train all staff. Document corrective actions taken.
32-6-501.11-.12/6-202.14
Toilet Enclosed Clean
No soap or paper towels at front handsink. Provide.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
Floors are soiled under storage racks and equipment. Clean to remove. Ice buildup on the floor of the walk-in. Clean to remove.
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas