The Westland
FAILWednesday, March 6, 2019 at 2:26 PM
Violations Cited
08-3-302.11/3-304.11
Separation Segregation Cross Contamination
Observed employee carrying large sheet pan of products for kitchen set up. Employee placed sealed packages of raw burgers directly on top of breads. Review cross contamination with all employees
Why This Matters
Cross-contamination can spread dangerous pathogens throughout the facility
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
M-3-603.11
Consumer Advisories
Consumer advisory on menu incomplete- Reminder required for specific foods available raw/ undercooked. Remove asterisk from items not available raw/ undercooked
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
17-4-302.14
Test Kit Provided
No test kit available for quats sanitizer at the time of inspection- Provide
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Ceiling above stairwell to lower prep with peeling paint- Repair Sink replaced in employee restroom. Tiles missing on sides of sink- Repair Black mold like buildup on walls in warewashing- Clean with proper frequency
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones