UNITED HOUSE OF PRAYER
PASSTuesday, November 19, 2013 at 3:05 PM
Violations Cited
M-2-102.11
PIC Knowledge
provide a serv-safe certificate and food allergen certificate - asap
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper management & personnel procedures. Train all staff. Document corrective actions taken.
32-6-301.11-02.11
Hand Cleaner Drying Tissue Signage
provide papertowels at handwash sink in snack bar area provide papertowels at all handwash sinks through-out
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
33-5-501.116
Improper Cleaning of Receptacles
keep dumpster closed at all times keep both grease barrels covered and locked at all time provide missing cover and locking rim for grease barrel
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
36-6-501.11-.12
Improper Maintenance of Floors
clean floor under behind and between all equipment and shelves through-out all stock rooms all prep areas all cooking areas and all warewashing areas
Why This Matters
CONTAMINATION RESERVOIR: Damaged floors harbor bacteria in cracks. Standing water breeds Listeria, Pseudomonas. Broken tiles create pest harborage. Floor contamination spreads via shoes, equipment wheels, and dropped items. CDC found floor drains positive for Listeria in 40% of retail delis.
Code Requirements
Floors must be: Smooth and non-porous in food areas; Properly sloped to drains (1/8 to 1/4 inch per foot); Coving at wall junctures sealed; No cracks, holes, or missing tiles; Grout intact and sealed; Cleaned daily or more frequently; Dry except when cleaning.
Corrective Actions
Schedule floor repairs within 30 days; Seal all cracks immediately with approved sealant; Improve drainage to eliminate standing water; Increase cleaning frequency; Replace missing tiles; Re-grout as needed; Remove any carpeting from food areas