ABE & LOUIE'S
PASS W/ CONDITIONSThursday, April 7, 2011 at 4:21 PM
Violations Cited
33-5-501.13-.17
Adequate Number Frequency Vermin Proof
Provide covered trash receptacle as both men and women use the restroom.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
36-6-201.11
Floors Designed Constructed Installed
Clean floors to remove food debris especially in deep grout lines.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, non-porous surfaces; Properly sloped to drains; No gaps or cracks; Maintained clean
37-6-201.11
Walls/Ceilings Designed Constructed Installed
Clean/Replace heavily soiled ceiling tiles above and around three bay area.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition
37-6-201.11
Walls/Ceilings Designed Constructed Installed
Regrout along the top edge of the handsink.
Why This Matters
Poor facility maintenance can harbor pests and prevent proper cleaning
Code Requirements
Smooth, washable surfaces; No holes or damage; Light-colored in food areas; Clean condition
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Clean grill and other cooking equipment to remove soil grease and food debris.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones