Boston Globe Cafeteria
PASSMonday, February 22, 2010 at 3:10 PM
Violations Cited
12-2-301.12-.15
Adequate Handwashing/Where/When/How
Employee observed handling soiled equipment then handling clean equipment without changing gloves or washing hands. Address.
Why This Matters
Inadequate handwashing is a leading cause of foodborne illness transmission
Code Requirements
Immediate correction required. Follow health code section . Implement proper personal hygiene procedures. Train all staff. Document corrective actions taken.
41-7-201/04.11
Separation/Sanitizer Criteria
Sanitizer at 3 bay sink was testing at close to 400ppm. Corrective actions were taken at time of inspection. Ensure sanitizer is set up at the proper dilution.
Why This Matters
This violation directly contributes to foodborne illness risk
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
14-4-202.11
Food Contact Surfaces Design
Cutting board being used to peel vegetables visibly soiled and scoared. Clean to remove or replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
15-4-202.16
Non-Food Contact Surfaces
Light out above Reach-in #1. Repair or replace. Gasket of walk-in# 1 in dis-repair. Repair.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
24-4-903.11
Clean Equipment & Utensils Storage
Rack for Blodgett oven stored on ground behind oven. Discontinue and store clean and protected. Pots stored directly next to drainage pipe and under hand sink. Discontinue and store clean and protected.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper cleaning & sanitization procedures. Train all staff. Document corrective actions taken.
25-4-904.11
Single Service Articles Stored Dispensed
To go containers stored under pipes of hand wash sink at Pizza station. Discontinue and store clean and protected.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
26-4-502.13
Re-use of Single Service Articles
Plastic cup being used to dispense sunflower seeds in Reach-in # 2. Discontinue and use a handeled scoop to prevent contamination from hands.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
29-5-201/02.11
Installed and Maintained
Pipe under hand sink by 3 bay sink leaking. Repair or replace.
Why This Matters
This violation affects overall sanitation and food safety
Code Requirements
Immediate correction required. Follow health code section . Implement proper food safety procedures. Train all staff. Document corrective actions taken.
37-6-501.11-.12
Improper Maintenance of Walls/Ceilings
Filters above fry and grill station with heavy grease build-up. Clean to remove.
Why This Matters
OVERHEAD CONTAMINATION: Peeling paint and debris fall into food. Condensation on ceilings drips bacteria onto prep surfaces. Studies found ceiling tiles harbor Bacillus cereus spores. Restaurant ceiling collapse contaminated food service for 200 guests.
Code Requirements
Walls/ceilings must be: Smooth and washable in food areas; Light-colored for easy soil detection; Free of holes, cracks, peeling paint; Sealed at all joints and attachments; Clean and free of grease, dust, cobwebs; Non-absorbent in areas subject to moisture.
Corrective Actions
Repair all holes within 14 days; Repaint with washable paint; Replace damaged ceiling tiles; Seal all penetrations; Clean walls and ceilings monthly; Fix any leaks immediately; Install FRP panels in splash zones